Please refer to ˇ§Project Referencesˇ¨ where all our project references are available for download

Client
Ministry of Interior, Public Works Department, Thailand; and the Contractor, Taisai Corporation.

Project
Industrial Ring Road Contracts
1 & 2; Cable Stayed Bridges.

Services
Construction engineering
Specialist consultant for both
cable stayed bridges at each construction stage
Designs of temporary works structures

Services period
2002 - 2006

 

Client
Miaoli City Government & Yong Lian Construction Engineering Company, Taiwan.

Project
Keshu Suspension Bridge, Miaoli County, Taiwan.
The bridge concept was developed for a turnkey bid and was selected as the winning design.

Services
Concept design
Feasibility study
Preliminary & detailed design
Contractors consultant
Camber control calculations
Project planning
Supervision during construction

Services period
2003-2006

 

Client
THSRC Lot C250; the Taiwan High Speed Rail
Corporation; the BOT concessionaire company responsible for the 345 km high speed rail project between Taipei and Kaohsiung.

Project
Warren Truss Steel Bridges used for very long span crossings on the high speed rail alignment.

Services
Preliminary Design
Detail Design

Services period
1999 - 2007

 

Client
Mega Yapi Construction and Trading Company, Turkey.

Project
The Manavgat Antalya Cable Stayed Road Bridge, Turkey.

The first ever cable stayed bridge in Turkey

Services
Preliminary design
Detailed design

Services are being provided for the preliminary design and detail design
for the Ministry of Public Works and Settlement, General Directorate of Highways, Manavgat Antalya Cable Stayed Bridge.

Services period
2007 - ongoing

 

Client
Vela VKE.

Project
Gautrain HSR Viaduct Section, South Africa
Design Services for 5 Precast Segmental Viaducts

Services
Detailed design
Specialist consultant

Services period
2006 - ongoing

 

Client
Dolsar Muhendislik Company, Turkey.

Project
Artvin ˇV Erzurum Road BridgeS
(Four Free Cantilever Bridges).

Sengan Bridge
Budan Bridge
Bertha Bridge
Arkansin Bridge

Services
Preliminary Design
Detailed design.

Services period
2006 - 2007

 

Client
Taipei City Government, Taiwan.

Project
Tah Chi Cable Stayed Bridge.

Services
Feasibility study
Preliminary & final design
Equipment and temporary
works designs
Construction stage calculations
Contractors consultant
Camber control calculations and stressing instructions
Project planning
Supervision during construction

Services period
1998 ˇV 2003

 

Client
MOTC; Ministry of Transportation
and Communications and Riato
Construction Company.

Project
Bei Kang Extradosed Bridge.

Services
Construction stage calculations
Contractors consultant
Camber control calculations
Prestress shop drawings
Supervision during construction

Services period
2005 ˇV 2007

 

Client
Taiwan Area National Expressway Engineering Bureau; TANEEB.

Project
Kao Ping Hsi Cable Stayed Bridge.
Services
Feasibility study
Preliminary & detailed design
Wind tunnel testing

Services periods
1993 - 1996 & 1998 - 2000

Background
The Kao Ping His Bridge is located on the border between Kaohsiung and Pintung Counties.